DIY Mudroom Locker
How to build your own mudroom locker as seen on Expresso breakfast show on SABC 3
A Mudroom Locker is the perfect solution to keep the whole family’s items stored and organised in one place.
Give each family member their own space to store items like hats, jackets, school backpacks, handbags, sporting equipment, keys or anything else they may need on the go.
Downloads:
Materials:
22mm Pine cut to:
2 x 1978mm x 430mm (Side panels)
2 x 1156mm x 410mm (Middle shelves)
1 x 1156mm x 430mm (Floor panel)
1 x 1220mm x 440mm (Top panel)
1 x 1156mm x 100mm (Kick plate strips)
2 x 1042mm x 410mm (Top vertical dividers)
2 x 370mm x 410mm (Bottom vertical dividers)
6mm MDF backing board cut to:
1976mm x 1198mm
Tools:
20mm Screws (for hooks and corner blocks)
40mm Screws
25mm Wire Nails
A square or a ruler
Rough and Fine Sand Paper (P120 and P150)
Drill and drill bits
Pencil
Tape Measure
White Wood Glue
Hammer
12 x Plastic Corner blocks
Plastic Caps (to cover screws)
Wood filler
Cleaning materials – Cloth rags and a bucket of water
Step 1: Measuring and Marking
With instructions and drawings on hand – Lay panels flat on a work table or floor.

Mark the positions on the side panels for the adjoining shelves and dividers out with pencil for your Floor, Middle Shelves, Dividers and Top Panel.
TIP: Lay the 2 x side panels next to each other side by side – so that you only need to measure once. Measure all the way across both of them and draw a straight line in pencil from one side across to the other using a long straight edge ruler or the thin wood strip. When Marking – measure 1mm narrower than the thickness of the panel (22mm) so that the pencil marks are hidden by the shelves themselves and won’t need to be erased afterwards. i.e. 21mm. Draw 2 lines for each shelf.
When the time comes to join the panels with screws, place the shelf exactly over the pencil lines.


TIP: Don’t push too hard with the pencil. Remember to mark out on the floor, middle shelves and top panel where the dividers will be fixed according to the drawings.
Step 2: Drilling Pilot Holes
Drill 3 or 4 holes in your side panels within the pencil markings for your screws to go through for each shelf(floor and middles shelves) as well as the holes in the shelves for the dividers.
Drill 2 x holes on each short side of your top panel to fix it to the side panels.
TIP: Use a piece of scrap wood underneath the panels when drilling to avoid drilling into the floor or work table.

Step 3: Assembling and Adjoining Panels
Assemble the centre unit:
Ask someone to help you hold the panels on their edges while you fix panels together with screws.
Start by adjoining the long vertical dividers to the shelves above and below, by adding a line of wood glue within pencil markings and then placing shelves into position before drilling screws through the pre-drilled pilot holes and into the end grain edges of the dividers.



Assemble and attach the bottom unit and side panels:
Next, join the bottom (shorter) dividers to the floor panel and place the unit into position below the centre unit(Please note that this bottom unit cannot be fixed with screws so will be joined using corner blocks later on).
TIP: Secure the 2 end screws first, and then the middle screws.
Fix side panels by drilling screws through to the edges of the shelves, complete one entire side before fixing the other side panel to the shelves.


Once side panels have been fixed, use corner blocks to fix the bottom unit to the centre unit (2 on each side if possible)

Finally, fix the Top panel to the unit and the Kick Plate strip to the floor panel to finish it off.


Step 4: Marking holes for MDF Backing board and Hooks.
Stand the unit upright.
Ask your helping hand to hold the backing board in place while you knock in a nail into each corner. Don’t knock the nails all the way in as you will remove the board again for painting – but the position holes will make it easier for you to fix the backing board on and into place later.
Measure and mark out the position of the hooks.
Hold the hooks in place while you use a nail to make pilot holes to fasten the hooks onto the unit with screws
Do not fix the hooks until you have finished priming and painting the unit.
Step 5: Surface Preparation
Start sanding all edges and corners to your preference (rounded corners?) using a rough sandpaper (P120) and finish off with a fine sandpaper (P220) to get a smooth finish.
TIP: If working with Pine or softwood don’t press too hard on the edges and corners as they will be ruined easily – rather go little by little until you have the roundness that you prefer


Step 7: Priming and Painting
Prime your unit with Duram’s Wood Primer that will help seal and protect your wood and ensure that the topcoat can be added smoothly, and perform better. Let the primer dry for 6 – 8 hours and then you are ready to paint with your choice of colour with Duram Enamel&Trim.

Step 8: Final Assembly
Assemble the Backing and the Hooks using pre-marked out / drill holes. This unit was painted with Enamel&Trim 135-2 Chapel Spire and 137-5 Barbizon Blue.

